West End Barn

Fileturn undertook a technically challenging 15 month conversion of a 3 Bedroom Grade II Listed barn and external areas to create a 5 Bedroom prime residential residence.

The works included an extensive basement build to provide a large study with internal and external winter gardens. This structure took 12 months to construct and included over 130 auger bored 16m piles, extensive tanking, damp proofing and major structural works to retain and adapt the existing building.  The new basement provides a link between two stand alone buildings. Bespoke staircases and handrails installed to connect the two buildings

The creation of a hand made bespoke hard wood, free standing kitchen, with central island unit, all fitted with solid marble tops. Limestone flooring throughout.

Reconfiguration of semi derelict building to provide a first floor master bedroom with ensuite bathroom and dressing room. Two further ensuite bedrooms were created on the ground floor with access to the courtyard.

Extensive M&E works throughout the property and the installation of a Rako smart lighting system, installation of air conditioning and alarm systems.

Specialist paint finishes and decorative wallcoverings applied throughout the property.

Procurement and installation of the FF&E packages to all areas of the property.

All exterior landscaping including reinstating the courtyard garden above the sub terranean additional level,  re-configuration of the driveway and front garden to provide additional parking for 4 cars.